The Company's portfolio includes both operational HPPs and construction phase HPPs. CCEH operates in full compliance with the Georgian legislation and regulations in accordance to the Environmental and Social Management Standards of international financial institutions such as IFC and EIB.
Bakhvi 2 HPP
- Bakhvi 2A is housed by Bakhvi 2 LLC
- The installed capacity of Bakhvi 2A plant is 11.4 MW and its annual generation amounts to 48.6 GWh
- The project consists of headworks, a fish pass, a buried penstock, and a powerhouse.
- The generated electricity will be transmitted via a 35 kV overhead transmission line to the planned 110/35 kV substation close to Bakhvi 1 HPP powerhouse
- Bakhvi 2B is housed by Bakhvi 2 LLC
- The installed capacity of Bakhvi 2B plant is 20.7 MW, whereas its annual generation amounts to 88.8 GWh
- The project consists of headworks, a fish pass, a buried penstock, and a powerhouse
- The generated electricity will be transmitted via a 35 kV overhead transmission line to the planned 110/35 kV substation close to Bakhvi 1 HPP powerhouse
Bakhvi 2 HPP is a scheme of small and medium-sized run-of-the-river plants (Bakhvi 2A HPP and Bakhvi 2B HPP), which is located on the Bakhvistskali river in the Guria region, Ozurgeti municipality, near Ukanava village.
Bakhvi 2A Plant
Bakhvi 2B Plant