The Company's portfolio includes both operational HPPs and construction phase HPPs. CCEH operates in full compliance with the Georgian legislation and regulations in accordance to the Environmental and Social Management Standards of international financial institutions such as IFC and EIB.
Bakhvi 1 HPP
- Bakhvi 1 HPP is housed by CCEH Hydro VI LLC
- The installed capacity of Bakhvi 1 HPP is 10.9 MW and its annual generation amounts to 43.1 GWh
- The project consists of headworks, a fish pass, a buried penstock, and a powerhouse
- The generated electricity will be transmitted via a 110 kV overhead transmission line into the national grid
Bakhvi 1 HPP is a small run-of-the-river HPP, which is located on the Bakhvistskali river in Guria region, Chokhatauri and Ozurgeti Municipalities.